Flexible Construction Site Services

Case Studies

As a trusted and dedicated site services provider for the construction industry, we can undertake projects of varying size and scale. MAG has had the privilege to work on several high profile projects including works at the Shell Tower, Hinkley Point, and the on-going works for the HS2 development.

One Sherwood Street – The Erith Group

MAG Properties Services Ltd was commissioned by Erith Group to conduct all electrical and mechanical decommission to the One Sherwood Street project. The first part of the works was to conduct surveys of all the individual building services and to identify the services required to be isolated and which required retaining. In conjunction to the survey the requirement for a welfare location to be installed and constructed.

The welfare location required laying new flooring, installing kitchen units for canteen space and offices, and to provide power and lighting to adapt to the existing building services.

The electrical decommissioning works required isolating and making safe all outgoing electrical services to the building from the main LV room. These works required tracing electrical services to the main LV and isolating and identifying any service which required retaining.

The mechanical decommissioning consisted of isolating and purging the internal gas pipework from the incoming gas meter, isolating and draining down of the internal mechanical wet systems, decommissioning of AC system and decommissioning the redundant generator fuel tanks. The sprinkler system was identified to be servicing several of the buildings which required retaining. Works were conducted to carry out freezing of several of the sprinkler legs which serviced the buildings, to enable dismantling and demolition. This required specialist nitrogen freezing of the pipework to enable draining down pipework, whilst keeping the sprinkler service live to other buildings and capping off the supply.

The installation of temporary mechanical and electrical services required providing power for cranes, transformers, lighting and numerous activities on site. Mechanically services were required to install dust suppression system and water service for diamond drilling, concrete saw cutting, asbestos supplies and numerous other activities.

Site Services for 1 Sherwood Street

In all, MAG Properties Services Ltd provided the full range of specialist decommissioning service to isolate and make safe the site. With also getting the site ready and installing the site requirements,to ensure the site was fully functional and able to provide all aspects of a modern construction site needs.

Site Services for Contruction Industry

1
SHERWOOD
STREET

HS2 – Old Oak Common

Old Oak Common is a new super-hub set to be the best-connected and largest new railway station ever built in the UK. The station will have fourteen platforms, a mix of six high-speed and eight conventional service platforms, with an 850m-long station box, big enough to fit 6,300 Routemaster buses inside.

Old Oak Common will become one of the country’s most vital transport super-hubs. The station is expected to be one of the busiest railway stations in the country with high-speed rail services to the Midlands, Scotland and the North, and access to central London and Heathrow via the Elizabeth line. Passengers will also be able to travel to Wales and the South West. Its construction and operation will also drive the regeneration of the area around it in West London.

Contruction Site Services for Old Oak Common
Contruction Site Services for HS2

101 Cleveland – McLaren Construction

MAG Properties Services have been awarded the site temporary package for 101 on Cleveland by McLaren construction. 101 Cleveland Street is a high-end residential development in the heart of London’s Fitzrovia.

Domestic in scale and urban in outlook, this thoughtfully configured trio of buildings range between 3 and 9 storeys. One, two and three bedroom apartments are arranged across a distinctive wedge-shaped footprint, sensitively integrating the scheme into the surrounding streets with a creative edge.

Site Services for Contruction Industry

101
CLEVELAND

YY London – Skanska

“As the first building you see as you arrive, YY London will become an iconic gateway to a new Canary Wharf.”

MAG have been on site with Skanska carrying out mechanical, electrical and environmental works throughout the project. We have installed a 1600amp distribution panel to supply the temporary power across the site and lighting circuits throughout including the hoarding lights which will be seen by up to 120,000 passers-by per day.

The 414,000 square foot, 11 storey commercial office building will have a complete refurbishment including three new office floors, a new reception and new lifts.

MAG are undertaking a wide scope of works from installing high level waste pipes to powering secured site entrances and hoists.

MAG have a wide variety of Plant available for hire including MEWPs and access equipment which allowed for the installation of this high level waste pipe and other site services. Our operatives are trained in both IPAF & Pasma and can operate and erect different types of access equipment.

Plant Hire by MAG

We have installed a full welfare set up including toilets, showers and kitchens as well as heating and lighting to the main offices and meeting rooms. Water is supplied throughout the site by one of MAGs 3 phase booster pump and tank set ups and waste is handled by our 3 phase vortex twin macerators.

The building is targeting environmental standards to achieve BREEAM Outstanding and the WELL Building Standard Platinum accreditations.

YY London